Scaffold Tubes, Tube Clamps and Fittings

Build anything from industrial shelving to gym rigs, garden structures to furniture frames with our complete range of scaffold tubes (poles or pipes), modern tube clamps and traditional fittings.


Scaffold Tubes
  • 48.3mm diameter (standard) – up to 13ft lengths, new or used
  • 33.7mm diameter (narrow) – up to 13ft lengths, lighter-weight projects
  • Load capacity up to 8 tonnes
  • Custom cutting available
Tube Clamps (Modern System)
  • 30+ connector types for endless design possibilities
  • Easy assembly with Allen keys – no welding required
  • Powder-coated finish (black or galvanised)
  • Adjustable and reconfigurable
  • Available for both 48.3mm and 33.7mm tubes
Traditional Scaffold Fittings
  • Heavy-duty metal couplers (single, double, swivel, sleeve)
  • Maximum strength, fast installation
  • Authentic construction-site look
  • 48.3mm tubes only
  • Budget-friendly for large projects
Popular projects: Shelving units, clothes rails, gym equipment, garden pergolas, industrial furniture, retail displays, handrails, standing desks.
Not sure which system to choose? Tube clamps offer modern versatility and easy assembly. Traditional fittings provide maximum strength and authentic industrial style. Email hello@thescaffshop.com for project advice.
Free shipping over £200 with code FREEDELIVERY200

 

Scaffold Tubes are also known as Scaffold Pipes and Scaffold Poles

 

  • 1
  • 2

Scaffold Tubes, Tube Clamps and Fittings FAQ's

We offer up to 10ft scaffold poles, but various sizes are available. Scaffold poles though could be as long as 21ft, however we don't stock these currently.

Known as scaffold tubes, uprights are vertical tubes that transfer the entire weight of the structure to the ground, where they rest on a square base plate to spread the load.

It takes around twenty minutes to cut a scaffold pole with a hacksaw, and there will be a lot of sweat and armache! We suggest using a battery disc cutter. We can also cut the poles to the length required.

In terms of measurements, a steel scaffold tube can carry a working load of as much as 8 tonnes.

A joint pin coupler is designed to connect two scaffold tubes, end to end.

Our tube clamp fittings and connectors are ideal for joining our Scaffold Tubes to make a massive range of potential designs.